New Sports Pavilion
Brief
EasyFlow replaced the old modular cricket pavilion in an exciting development for a local cricket club, which we have been pleased to be a part of.
Key Considerations
The existing concrete sub-base was uneven due to years of wear. There was also a tight turnaround, as builders needed to be back in the pavilion as soon as possible to finish works on schedule.
What We Achieved
Easyflow levelled out the existing concrete sub-base using a rapid drying, self-smoothing, self-levelling screed in preparation for new carpet tiles.
Within two hours of installation, the builders were back working inside the building.


Where To Find Us