News

Renovation in Great Boughton, Cheshire

A Chester-based construction company was working on a four-storey renovation with a requirement for #underfloorheating.

Having visited the site to ascertain the scope of works, our UFH Consultant designed an Easy-Standard system for the lower ground floor/basement area to be clipped through 100mm thermal floor insulation and finished with 50mm anhydrite liquid floor screed.

However, due to height and weight restrictions on the upper three storeys, he chose a low profile 20mm tray laid over a structural timber board. The Easyflow installation team fixed down the adhesive-backed boards and then applied a layer of gypsum-based, flexible, self-levelling floor compound.

This system allows for excellent thermal conductivity and the minimal floor build-up will be ready to take the clients’ floor tiles and engineered wood floors. ​